home | CONTACT
Company Services Plans Agreements Technology Curriculum Capacitation Records
Curriculum

Up-date
Basic Engineering
Detail Engineering
Civil Construction
Electromechanical
Acoustic
Curriculum empledos
























 
Update
 


Environmental Engineering, Studies and Investigations 2006 to date
•Consultant for development of environmental power project in Cuatro Ciénegas Coahuila.
•Environmental update for TOLTECA plant and engineering for hazardous residue and material warehouse.
•Environmental soil Impact Assessment from spill in PIPSA in the Santa Catarina river N. L.
•Conceptual engineering of environmental technologies applicable to a residur treatmente center, for MRP authorization request with SEMARNAT.

2005
•Detailed engineering for a treatment center for drilling material and final disposal cell.

2004
•Underground Environmental Impact Assessment, basic and detail engineering for a recovery trench  in Kenworth plant in  Mexicali BC, from HCB’s leaking to underground.

2003
•Basic and financial engineering of the waste Treatment Center, water and boring material in Tabasco, for  Earth Tech México  and Operadora Intergrupo
•Basic and financial engineering  for portable and semi fixed treatment plants for drilling well water from PEMEX PEP, for  Earth Tech México.
•Basic and detailed engineering of a final disposal cell fro hazardous slag for PIPSA in García NL.
•Packing PCB’s for  SEM Tredi in  Galvak plant, San Nicolás de los Garza NL.

2002
•Basic and financial engineering for final disposal cell for sulfur residues from PEMEX PGYPB in Texistepec Ver., for  Earth Tech México.
•Detailed engineering for HCB recovery and Palencia Pit treatment in PEMEX refinery in Minatitlan Ver., for Promotora Ambiental.
•Design and Engineering of Treatment Center for hazardous “Drilling Waste” cells, and pits, Promotora Ambiental General Bravo, N.L
•Detailed engineering of Industrial Waste Confinement Cells 300,000 m3. Delta, S.A. de C.V. García, N.L.
•Detailed engineering of Industrial Waste Confinement Cells 350,000 m3. Delta, S.A. de C.V. San Luis Potosí, S.L.P
•Detailed engineering of Lead Slag Hazardous waste 65,000 m3. Corporación Pipsa García, N.L.
•Detailed engineering of Lead Slag Hazardous waste 200,000 m3. Enerteck  García , N.L.
•Risk and environmental impact Study for Hazardous Waste Treatment Center for Drilling waste “Las Anacuas” and lobbying with environmental authorities. Promotora Ambiental General Bravo, N.L.
•Risk and environmental impact Study for Lead Smeltin Slag Hazardous Waste Confinement Cells and coordinate authorization paperwork with IPA / CAINTRA and environmental authorities. Corporación Pipsa García , N.L.
•PASA, risk and environmental impact study for hazardous waste treatment center in Bravo  N. L.
•PACE Industries, Sooil contamination investigation, EPA Phase  I and II, in real estate next to the plant in Ramos Arizpe Coah.
•Ford Plant in Hermosillo Son., confined space environmental cleanup in 2 Glycol storage tanks

Back Next