home | CONTACT
Company Services Plans Agreements Technology Curriculum Capacitation Records
Curriculum

Up-date
Basic Engineering
Detail Engineering
Civil Construction
Electromechanical
Acoustic
Curriculum empledos
























 
Update
 


Construction Electromechanical 2005 to date
•Install Mate processing glass plant, for  VITRO in Garcia N. L.
•Dismantling in PIPSA and rebuild CaO pneumatic transport system, for Operadora Intergrupo.

2004
•Build sterile water system in Fersinsa, Ramos Arizpe Coah.

2003
•Cleaning heat exchanger with pressure water 10,000 #, Earth Tech México PEMEX refinery plant in Cadereyta.

2002  
• Vitrocrisa, plant M, repair roofing (3,200 m2) for their buildings in Monterrey N. L.
• PASA, build two industrial buildings, 600 m2 and 1,000 m2
• Vitrocrisa, plant in Ruiz Cortines, Ventilation system for Furnace #6 in Monterrey N. L.
• Vitrocrisa, plant in Ruiz Cortines,  Install temperature measuring system for heat treatment, Monterrey N. L.
• Metalsa, Mechanical personnel through administration for support in repairs of heat treatment, Apodaca N. L.
• Sewer water treatment plant for PEMEX pumping stations from Naranjos Ver, to  Juárez Chih., for  PROSIPA.
• Radiation proof booths for GE Medical, Apodaca N. L.


Back Next